RegionGlobal Website
News Center
News Center
Ferrotec(Anhui) annual output of 1.8 million semiconductor wafer regeneration project is also in short supply of construction materials and is trying to solve the problem
2020-02-27

    According to fenghuang.com, from February 12, the annual output of 1.8 million semiconductor wafer regeneration project in Ferrotec(Anhui), Tongling,  has officially resumed work. At present, there are 141 employees, mainly engaged in the main construction of office buildings and production workshops.

d77578a4a284485cba4cc42e02a81760.png

    However, affected by the epidemic, some construction projects also face the shortage of construction materials. Previously, jiwei.com reported that the 8-inch project was delayed for more than a week due to the concrete break. Similarly, there are problems with construction materials in Anhui fuleide project.

    At present, Yian economic development zone and relevant functional departments in Tongling are trying to help solve problems such as construction materials and employment, fenghuang.com reported.

    Ferrotec(Anhui) Changjiang semiconductor materials Co., Ltd. was formally established in 2019 with a total investment of 1 billion yuan. It is a comprehensive high-tech enterprise engaged in electronic technology and material science research services jointly established by Shanghai Shenhe thermomagnetic Electronics Co., Ltd. and Tongling Development Investment Group Co., Ltd.

    On October 18, 2019, the foundation laying ceremony of Ferrotec(Anhui) Yangtze River semiconductor wafer regeneration project was held in Tongling.

    The construction period of the project is planned to be 15 months. After the completion of the project, an annual production line of 1.8 million 300 mm semiconductor wafer precise regeneration will be formed.